Pan African – Results of Manica pre-feasibility study
Pan African announces the results of the preliminary in-house pre-feasibility study conducted on the Manica (Fairbride) project. Several components of the study have been signed off by independent consultants, including the mine design, resource estimate and the environmental impact assessment. Capital expenditure estimates and plant design have been reviewed internally.
The pre-feasibility study was based on the Manica resource of 2.571Moz (33.8Mt @ 2.36g/t) as announced on 26 February 2009.
After completing a modelling exercise using the internationally-recognised Surpac 3D mine design modelling system, the Company plans to apply a two-phased approach to the mine design. Phase one of the design will incorporate an open-pit design, mining to a vertical depth of 30m. Phase two will see the Company move production underground where various mining methods will be applied depending on geological conditions.
The refractory part of the mineralized zone representing 93% of estimated resources will require the construction of both a BIOX® plant – using the technology in place at Barberton Mines, Pan African’s South African gold mining operation as well as a Carbon-in-Leach (‘CIL’) plant. The CIL is the less costly of the two, encouraging the Company to seek to consolidate further assets in the area with oxide material which can be mined delaying the investment in the BIOX® processing plant.
The Company has been engaging with other exploration parties operating in the Manica district with the full support and encouragement of the Mozambique Ministry of Mineral Resources, in an effort to consolidate additional resources in the area. If successful, this could further improve the financial parameters of the project.
Preliminary Financial modelling and results
Plant capacity – 80 000 tonnes per month
Plant Recovery factor – 86.5%
Production rate – 80 000 tonnes per month
Total tonnage to be produced during LOM – 9.26Mt
LOM in years – 11 years
Total content delivered to mill – 917 000 oz
Capital cost estimate – US$ 80 million
Total mining cost – US$ 375/oz
Discount rate applied – 15 %
Gold price – US$ 750/oz
NPV – US$ 45 million
IRR – 32%
An external Mozambique-based consultancy, Geoide Consultoria LDA, identified no anomalous issues or risks in the Environmental Impact Assessment of the proposed Fairbride operation.
“We’re pleased with our findings and are working towards consolidating other potential mineralised areas in the district to grow our current resources, further our optimisation work and receive independent verification. The next step will be completing a Bankable Feasibility Study.” commented Jan Nelson, CEO of Pan African.